yourstate.us
40 CFR 60.2050

§ 60.2050 What is a siting analysis?

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 60.2050, § 60.2050 What is a siting analysis?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/172602
Permanent ID
ys:prov:172602@1
SHA-256
6492d8e9d6c3bf868a2facbb05d2ccd5cfb84b3738863c37c547773b50d2ae53

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The siting analysis must consider air pollution control alternatives that minimize, on a site-specific basis, to the maximum extent practicable, potential risks to public health or the environment. In considering such alternatives, the analysis may consider costs, energy impacts, nonair environmental impacts, or any other factors related to the practicability of the alternatives. (b) Analyses of your CISWI's impacts that are prepared to comply with state, local, or other federal regulatory requirements may be used to satisfy the requirements of this section, provided they include the consideration of air pollution control alternatives specified in paragraph (a) of this section. (c) You must complete and submit the siting requirements of this section as required under § 60.2190(c) prior to commencing construction.

Legislative history