40 CFR 60.5215
§ 60.5215 By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 60.5215, § 60.5215 By what date must I conduct annual air pollution control device inspections and make any necessary repairs?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/173105
- Permanent ID
ys:prov:173105@1- SHA-256
43d3b45722247c7044a2ad621dc38c72f227986bb6e711b0d9f9e7d79da2efc5
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) You must conduct an annual inspection of each air pollution control device used to comply with the emission limits, according to § 60.5220(c), no later than 12 months following the previous annual air pollution control device inspection.
(b) Within 10 operating days following an air pollution control device inspection, all necessary repairs must be completed unless you obtain written approval from the Administrator establishing a date whereby all necessary repairs of the affected SSI unit must be completed.