§ 60.5421a What are my additional recordkeeping requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants?

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 60.5421a, § 60.5421a What are my additional recordkeeping requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/173182
Permanent ID
ys:prov:173182@1
SHA-256
8fe923a2d61ff949fe167677f7ad7c39e0a7cc6244407a8d1efab9759bb4157f

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) You must comply with the requirements of paragraph (b) of this section in addition to the requirements of § 60.486a. (b) The following recordkeeping requirements apply to pressure relief devices subject to the requirements of § 60.5401a(b)(1). (1) When each leak is detected as specified in § 60.5401a(b)(2), a weatherproof and readily visible identification, marked with the equipment identification number, must be attached to the leaking equipment. The identification on the pressure relief device may be removed after it has been repaired. (2) When each leak is detected as specified in § 60.5401a(b)(2), the information specified in paragraphs (b)(2)(i) through (x) of this section must be recorded in a log and shall be kept for 2 years in a readily accessible location: (i) The instrument and operator identification numbers and the equipment identification number. (ii) The date the leak was detected and the dates of each attempt to repair the leak. (iii) Repair methods applied in each attempt to repair the leak. (iv) “Above 500 ppm” if the maximum instrument reading measured by the methods specified in § 60.5400a(d) after each repair attempt is 500 ppm or greater. (v) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak. (vi) The signature of the owner or operator (or designate) whose decision it was that repair could not be effected without a process shutdown. (vii) The expected date of successful repair of the leak if a leak is not repaired within 15 days. (viii) Dates of process unit shutdowns that occur while the equipment is unrepaired. (ix) The date of successful repair of the leak. (x) A list of identification numbers for equipment that are designated for no detectable emissions under the provisions of § 60.482-4a(a). The designation of equipment subject to the provisions of § 60.482-4a(a) must be signed by the owner or operator.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.