40 CFR 60.6550

§ 60.6550 How do I monitor the load of my municipal waste combustor?

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 60.6550, § 60.6550 How do I monitor the load of my municipal waste combustor?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/173531
Permanent ID
ys:prov:173531@1
SHA-256
cb1d5b6700516d77a018810ef2ed201211cd80134e455ecd1eb1bd42b5e5f800

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) If your municipal waste combustor generates steam, you must install, calibrate, maintain, and operate a steam flowmeter or a feed water flowmeter and meet all the following five requirements: (1) Continuously measure and record the measurements of steam (or feed water) flow in kilograms (or pounds) per hour. (2) Calculate your steam (or feed water) flow in 4-hour block arithmetic averages. (3) Calculate the steam (or feed water) flow rate using the method in “American Society of Mechanical Engineers Power Test Codes: Test Code for Steam Generating Units, Power Test Code 4.1—1964 (R1991),” section 4 (incorporated by reference, see § 60.17 of subpart A of this part). (4) Design, construct, install, calibrate, and use nozzles or orifices for flow rate measurements, using the recommendations in “American Society of Mechanical Engineers Interim Supplement 19.5 on Instruments and Apparatus: Application, part II of Fluid Meters,” 6th Edition (1971), chapter 4 (incorporated by reference, see § 60.17 of subpart A of this part). (5) Before each dioxins/furans performance stack test, or at least once a year, calibrate all signal conversion elements associated with steam (or feed water) flow measurements according to the manufacturer instructions. Measurement devices such as flow nozzles and orifices are not required to be recalibrated after they are installed. (b) Determine the maximum demonstrated municipal waste combustor load during the initial performance test for dioxins/furans and each subsequent performance test specified in § 60.6525 during which you achieve compliance with the dioxins/furans emission limit in Table 3 to Subpart WWWW. The maximum demonstrated municipal waste combustor load is the highest 4-hour arithmetic average load achieved during four consecutive hours during the most recent test. If a subsequent dioxins/furans performance test is being performed on only one municipal waste combustor as specified in § 60.6535, you may apply the same maximum municipal waste combustor load from the tested facility for all the similarly designed and operated municipal waste combustors.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.