§ 62.14560 How do I comply with the increment of progress for submittal of a control plan?

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 62.14560, § 62.14560 How do I comply with the increment of progress for submittal of a control plan?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/174601
Permanent ID
ys:prov:174601@1
SHA-256
f7bdb4508ee9dc3a6723eadcd045c3321113f3247c3d6c930eac9f5c96475536

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section. (a) Submit the final control plan that includes the six items described in paragraphs (a)(1) through (6) of this section. (1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning capacity. (4) The anticipated maximum charge rate. (5) If applicable, the petition for site-specific operating limits under § 62.14640. (6) A schedule that includes the date by which you will award the contracts to procure emission control equipment or related materials, initiate on-site construction, initiate on-site installation of emission control equipment, and/or incorporate process changes, and the date by which you will initiate on-site construction. (b) Maintain an on-site copy of the final control plan.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.