40 CFR 62.15900
§ 62.15900 How do I comply with the requirement for submittal of a control plan?
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 62.15900, § 62.15900 How do I comply with the requirement for submittal of a control plan?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/174820
- Permanent ID
ys:prov:174820@1- SHA-256
e9b7085467b72959896af7aaaba1c4d6753169d2b79caeee5899c1cd7be4f1a0
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
For your control plan, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section.
(a) Submit the final control plan to your EPA regional office and permitting authority or delegated authority that includes the four items described in paragraphs (a)(1) through (4) of this section:
(1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limits and standards and other requirements of this subpart;
(2) The type(s) of waste to be burned, if waste other than sewage sludge is burned in the unit;
(3) The maximum design sewage sludge burning capacity; and
(4) If applicable, the petition for site-specific operating limits under § 62.15965.
(b) Maintain an onsite copy of the final control plan.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.