§ 68.170 Prevention program/Program 2.

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 68.170, § 68.170 Prevention program/Program 2, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/178403
Permanent ID
ys:prov:178403@1
SHA-256
0aad9556b962a1a35344ebd91a050ecf4847768f7f96c6b98d7868067675e8d4

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) For each Program 2 process, the owner or operator shall provide in the RMP the information indicated in paragraphs (b) through (k) of this section. If the same information applies to more than one covered process, the owner or operator may provide the information only once, but shall indicate to which processes the information applies. (b) The five- or six-digit NAICS code that most closely corresponds to the process. (c) The name(s) of the chemical(s) covered. (d) The date of the most recent review or revision of the safety information and a list of Federal or state regulations or industry-specific design codes and standards used to demonstrate compliance with the safety information requirement. (e) The date of completion of the most recent hazard review or update. (1) The expected date of completion of any changes resulting from the hazard review; (2) Major hazards identified; (3) Process controls in use; (4) Mitigation systems in use; (5) Monitoring and detection systems in use; (6) Changes since the last hazard review; and (7) Recommendations declined from natural hazard, power loss, and siting hazard evaluations and justifications. (f) The date of the most recent review or revision of operating procedures. (g) The date of the most recent review or revision of training programs; (1) The type of training provided—classroom, classroom plus on the job, on the job; and (2) The type of competency testing used. (h) The date of the most recent review or revision of maintenance procedures and the date of the most recent equipment inspection or test and the equipment inspected or tested. (i) The date of the most recent compliance audit; the expected date of completion of any changes resulting from the compliance audit and identification of whether the most recent compliance audit was a third-party audit, pursuant to §§ 68.58 and 68.59; and findings declined from third-party compliance audits and justifications. (j) The completion date of the most recent incident investigation and the expected date of completion of any changes resulting from the investigation. (k) The date of the most recent change that triggered a review or revision of safety information, the hazard review, operating or maintenance procedures, or training.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.