40 CFR 68.175
§ 68.175 Prevention program/Program 3.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 68.175, § 68.175 Prevention program/Program 3, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/178404
- Permanent ID
ys:prov:178404@1- SHA-256
5910fae630ff555fa91bbed347a91da1fd085c488e4a154175ef4b6a809eb2db
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) For each Program 3 process, the owner or operator shall provide the information indicated in paragraphs (b) through (p) of this section. If the same information applies to more than one covered process, the owner or operator may provide the information only once, but shall indicate to which processes the information applies.
(b) The five- or six-digit NAICS code that most closely corresponds to the process.
(c) The name(s) of the substance(s) covered.
(d) The date on which the safety information was last reviewed or revised.
(e) The date of completion of the most recent PHA or update and the technique used;
(1) The expected date of completion of any changes resulting from the PHA;
(2) Major hazards identified;
(3) Process controls in use;
(4) Mitigation systems in use;
(5) Monitoring and detection systems in use;
(6) Changes since the last PHA;
(7) Inherently safer technology or design measures implemented since the last PHA, if any, and the technology category (substitution, minimization, simplification and/or moderation);
(8) Recommendations declined from natural hazard, power loss, and siting hazard evaluations and justifications; and
(9) Recommendations declined from safety gaps between codes, standards, or practices to which the process was designed and constructed and the most current version of applicable codes, standards, or practices.
(f) The date of the most recent review or revision of operating procedures.
(g) The date of the most recent review or revision of training programs;
(1) The type of training provided—classroom, classroom plus on the job, on the job; and
(2) The type of competency testing used.
(h) The date of the most recent review or revision of maintenance procedures and the date of the most recent equipment inspection or test and the equipment inspected or tested.
(i) The date of the most recent change that triggered management of change procedures and the date of the most recent review or revision of management of change procedures.
(j) The date of the most recent pre-startup review.
(k) The date of the most recent compliance audit; the expected date of completion of any changes resulting from the compliance audit and identification of whether the most recent compliance audit was a third-party audit, pursuant to §§ 68.79 and 68.80; and findings declined from third-party compliance audits and justifications.
(l) The completion date of the most recent incident investigation and the expected date of completion of any changes resulting from the investigation.
(m) The date of the most recent review or revision of employee participation plans;
(n) The date of the most recent review or revision of hot work permit procedures;
(o) The date of the most recent review or revision of contractor safety procedures; and
(p) The date of the most recent evaluation of contractor safety performance.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.