yourstate.us
Md. Code, Pub. Safety § 12-1001

Md. Code, Pub. Safety § 12-1001

Maryland · Maryland Code, Public Safety · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Md. Code, Pub. Safety § 12-1001, Maryland, version 1 as recorded 2026-09-29, yourstate.us, https://yourstate.us/provision/1784933
Permanent ID
ys:prov:1784933@1
SHA-256
2225527ff44eb604e3821b3b25d111f7cd90a6bbf34e0f3434bd81756a291925

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) In this subtitle the following words have the meanings indicated. (b) “Addition” means an increase in: (1) building area; (2) aggregate floor area; (3) height; or (4) number of stories. (c) “Change of occupancy” means a change in the purpose or level of activity in a building or structure that involves a change in application of the local building code requirements. (d) “Construction permit application” means an application for a permit or other governmental approval for a rehabilitation project. (e) “Department” means the Maryland Department of Labor. (f) “Existing building” means a building or structure that was erected and occupied, or was issued a certificate of occupancy, at least 1 year before a construction permit application for the building or structure was made to a local jurisdiction, the Maryland–National Capital Park and Planning Commission, or the Washington Suburban Sanitary Commission. (g) “Local jurisdiction” means: (1) a county; or (2) a municipal corporation in the State. (h) “MBRC” means the Maryland Building Rehabilitation Code. (i) “Modification” means: (1) the reconfiguration of a space; (2) the addition or elimination of a door or window; (3) the reconfiguration or extension of a system; or (4) the installation of any additional equipment. (j) “Reconstruction” means: (1) the reconfiguration of a space that: (i) affects an exit or element of the egress access that is shared by more than a single occupant; or (ii) prevents occupancy of the work area because the existing means of egress and fire protection systems, or their equivalent, are not in place or continuously maintained; or (2) extensive modifications. (k) “Rehabilitation project” means construction work undertaken in an existing building that includes repair, renovation, modification, reconstruction, change of occupancy, or addition. (l) (1) “Renovation” means: (i) the change, strengthening, or addition of load bearing elements; or (ii) the refinishing, replacement, bracing, strengthening, upgrading, or extensive repair of existing materials, elements, components, equipment, or fixtures. (2) “Renovation” does not include: (i) reconfiguration of a space; or (ii) interior or exterior painting. (m) “Repair” means the patching, restoration, or minor replacement of materials, elements, components, equipment, or fixtures to maintain them in good or sound condition.