yourstate.us
Md. Code, Pub. Util. § 7-1004

Md. Code, Pub. Util. § 7-1004

Maryland · Maryland Code, Public Utilities · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Md. Code, Pub. Util. § 7-1004, Maryland, version 1 as recorded 2026-09-29, yourstate.us, https://yourstate.us/provision/1785597
Permanent ID
ys:prov:1785597@1
SHA-256
924a239874ba90012e15873f0e739db77bb9c616036ecf4574f1ed7ffdf5ad53

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) On or before May 1, 2025, the Commission shall adopt regulations to: (1) establish expedited processes for interconnecting the following systems to the electric distribution system: (i) bidirectional electric vehicle systems capable of providing electricity to the electric distribution system; and (ii) bidirectional electric vehicle systems that do not provide electricity to the electric distribution system but do provide electricity to a home, business, or other structure serviced by an investor–owned electric company; and (2) provide investor–owned electric companies with adequate time to ensure electric distribution system reliability in advance of the interconnections described in item (1) of this subsection. (b) An investor–owned electric company: (1) may require a customer to provide notice to the investor–owned electric company if the customer installs a bidirectional electric vehicle system described in subsection (a)(1)(ii) of this section; and (2) shall require a customer to apply for interconnection if the customer configures a bidirectional electric vehicle system to provide electricity to the electric distribution system. (c) A municipal electric utility or an electric cooperative may comply with the requirements of subsection (b) of this section in the same manner as an investor–owned electric company.