40 CFR 75.40
§ 75.40 General demonstration requirements.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 75.40, § 75.40 General demonstration requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/178668
- Permanent ID
ys:prov:178668@1- SHA-256
ec7f13e17ae3a10bc9b01c07cbda91b55f5534a642f8dd58caabc4111cf6cfa8
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The owner or operator of an affected unit, or the owner or operator of an affected unit and representing a class of affected units which meet the criteria specified in § 75.47, required to install a continuous emission monitoring system may apply to the Administrator for approval of an alternative monitoring system (or system component) to determine average hourly emission data for SO2, NOX, and/or volumetric flow by demonstrating that the alternative monitoring system has the same or better precision, reliability, accessibility, and timeliness as that provided by the continuous emission monitoring system.
(b) The requirements of this subpart shall be met by the alternative monitoring system when compared to a contemporaneously operating, fully certified continuous emission monitoring system or a contemporaneously operating reference method, where the appropriate reference methods are listed in § 75.22.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.