Md. Code, State Fin. & Proc. § 2-404

Md. Code, State Fin. & Proc. § 2-404

Maryland · Maryland Code, State Finance and Procurement · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Md. Code, State Fin. & Proc. § 2-404, Maryland, version 1 as recorded 2026-09-29, yourstate.us, https://yourstate.us/provision/1786869
Permanent ID
ys:prov:1786869@1
SHA-256
06a92c9d7d408fdc7c6a94f5cd405506f4bcab1c900ea383a0956e73c62d4959

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) If the State has agreed to pay the costs set out in § 2-402 of this subtitle and any additional construction costs associated with the connection, the State may connect a State facility, regardless of its location, to a publicly owned utility system. (b) If an existing publicly owned utility system is inadequate to handle proposed State utility needs, the State shall pay all costs that are: (1) associated with the expansion of the publicly owned utility system to meet the needs of the State; and (2) in excess of available federal funds. (c) Before connecting to any publicly owned utility system, the State shall: (1) coordinate with the owner of the publicly owned utility system; and (2) consider any existing master plan in establishing the fiscal obligation of the State under this section. (d) (1) After determining the need of the State for water or sewerage capacity, the State shall provide the information to the appropriate local jurisdictions. (2) The local jurisdictions shall include State facility needs in developing their master plans for water and sewerage systems.