40 CFR 142.55
§ 142.55 Final schedule.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 142.55, § 142.55 Final schedule, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/182149
- Permanent ID
ys:prov:182149@1- SHA-256
3277cc12faf124cfeaae3389cbdfb57df1ac79836b6e099e80e1efef387f1af7
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Within 30 days after the termination of the public hearing pursuant to § 142.54, the Administrator shall, taking into consideration information obtained during such hearing, revise the proposed schedule as necessary and prescribe the final schedule for compliance and interim measures for the public water system granted an exemption under § 142.52.
(b) Such schedule must require compliance with each contaminant level and treatment technique requirement with respect to which the exemption was granted as expeditiously as practicable but not later than 3 years after the otherwise applicable compliance date established in section 1412(b)(10) of the Act.
(c) [Reserved]
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.