40 CFR 192.03
§ 192.03 Monitoring.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 192.03, § 192.03 Monitoring, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/184333
- Permanent ID
ys:prov:184333@1- SHA-256
9cb286eebeafbea3b23ac53ae997f7bb455d27dcfcf75bfd077a265bd3e7e465
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02, and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c).
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.