40 CFR 258.26
§ 258.26 Run-on/run-off control systems.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 258.26, § 258.26 Run-on/run-off control systems, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/185242
- Permanent ID
ys:prov:185242@1- SHA-256
f109f6782be9da56b5ed5ee580080f71335d8d176e8d319d4bd3df3dc4343cb0
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Owners or operators of all MSWLF units must design, construct, and maintain:
(1) A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm;
(2) A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.
(b) Run-off from the active portion of the landfill unit must be handled in accordance with § 258.27(a) of this part.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.