yourstate.us
40 CFR 264.310

§ 264.310 Closure and post-closure care.

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 264.310, § 264.310 Closure and post-closure care, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/185662
Permanent ID
ys:prov:185662@1
SHA-256
6f08073752b2f559f13210cd6849975351e907cdc849cae266d7bc5606311c0d

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) At final closure of the landfill or upon closure of any cell, the owner or operator must cover the landfill or cell with a final cover designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed landfill; (2) Function with minimum maintenance; (3) Promote drainage and minimize erosion or abrasion of the cover; (4) Accommodate settling and subsidence so that the cover's integrity is maintained; and (5) Have a permeability less than or equal to the permeability of any bottom liner system or natural subsoils present. (b) After final closure, the owner or operator must comply with all post-closure requirements contained in §§ 264.117 through 264.120, including maintenance and monitoring throughout the post-closure care period (specified in the permit under § 264.117). The owner or operator must: (1) Maintain the integrity and effectiveness of the final cover, including making repairs to the cap as necessary to correct the effects of settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in accordance with §§ 264.301(c)(3)(iv) and (4) and 264.303(c), and comply with all other applicable leak detection system requirements of this part; (4) Maintain and monitor the ground-water monitoring system and comply with all other applicable requirements of subpart F of this part; (5) Prevent run-on and run-off from eroding or otherwise damaging the final cover; and (6) Protect and maintain surveyed benchmarks used in complying with § 264.309.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.