40 CFR 267.192

§ 267.192 What handling and inspection procedures must I follow during installation of new tank systems?

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 267.192, § 267.192 What handling and inspection procedures must I follow during installation of new tank systems?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/186187
Permanent ID
ys:prov:186187@1
SHA-256
842bdbe7e846312d4937a0e09e8a1fb65e37ad427d2d5fe508044898eb9cc235

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) You must ensure that you follow proper handling procedures to prevent damage to a new tank system during installation. Before placing a new tank system or component in use, an independent, qualified installation inspector or an independent, qualified, registered professional engineer, either of whom is trained and experienced in the proper installation of tank systems or components, must inspect the system for the presence of any of the following items: (1) Weld breaks. (2) Punctures. (3) Scrapes of protective coatings. (4) Cracks. (5) Corrosion. (6) Other structural damage or inadequate construction/installation. (b) You must remedy all discrepancies before the tank system is placed in use.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.