yourstate.us
40 CFR 761.210

§ 761.210 Use of the manifest—Generator requirements.

United States · 40 CFR — Protection of Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
40 CFR 761.210, § 761.210 Use of the manifest—Generator requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/194343
Permanent ID
ys:prov:194343@1
SHA-256
33df0ad1e1fd572e36905e472a1df0253b6a62837d07124300c1df8422e06e80

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The generator must: (1) Sign the manifest certification; and (2) Obtain the signature of the initial transporter and date of acceptance on the manifest; and (3) Retain one copy, in accordance with § 761.214(a)(1). (b) The generator must give the transporter the remaining copies of the manifest. (c) For shipments of PCB waste within the United States solely by water (bulk shipments only), the generator must send three copies of the manifest dated and signed in accordance with this section to the owner or operator of the designated facility. Copies of the manifest are not required for each transporter. (d) For rail shipments of PCB waste within the United States which originate at the site of generation, the generator must send at least three copies of the manifest dated and signed in accordance with this section to: (1) The next non-rail transporter, if any; or (2) The designated facility if transported solely by rail. (e) For rejected shipments of PCB waste that are returned to the generator by the designated facility (following the procedures of § 761.215(f)), the generator must: (1) Sign either: (i) Item 20 of the new manifest if a new manifest is used for the returned shipment; or (ii) Item 18c of the original manifest if the original manifest is used for the returned shipment; (2) Provide the transporter a copy of the manifest; (3) Within 30 days of delivery of the rejected shipment, send a copy of the manifest to the designated facility that returned the shipment to the generator; and (4) Retain at the generator's site a copy of each manifest for at least three years from the date of delivery.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.