40 CFR 792.31
§ 792.31 Testing facility management.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 792.31, § 792.31 Testing facility management, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/194580
- Permanent ID
ys:prov:194580@1- SHA-256
e07f36d514ae56d984b86a979d48b902c00532a4c54a23ce786e4e6d441f254c
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
For each study, testing facility management shall:
(a) Designate a study director as described in § 792.33 before the study is initiated.
(b) Replace the study director promptly if it becomes necessary to do so during the conduct of a study.
(c) Assure that there is a quality assurance unit as described in § 792.35.
(d) Assure that test, control, and reference substances or mixtures have been appropriately tested for identity, strength, purity, stability, and uniformity, as applicable.
(e) Assure that personnel, resources, facilities, equipment, materials and methodologies are available as scheduled.
(f) Assure that personnel clearly understand the functions they are to perform.
(g) Assure that any deviations from these regulations reported by the quality assurance unit are communicated to the study director and corrective actions are taken and documented.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.