41 CFR 101-30.702
§ 101-30.702 Determining item reduction potential.
United States · 41 CFR — Public Contracts and Property Management · Status: effective
Cite this
- Citation
- 41 CFR 101-30.702, § 101-30.702 Determining item reduction potential, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/197712
- Permanent ID
ys:prov:197712@1- SHA-256
823c6bdfdd58fda0a09afab478d72c5d42940588289dda8531f51977ac479c81
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Item reduction studies are required where there are large numbers of generally similar items which are subject to grouping and examination by item name, item name modifiers, or other characteristics such as sizes, grades, lengths, and materials. Before conducting a full scale item reduction study, the assignee activity shall determine whether sufficient item reduction potential appears to exist. Item reduction studies shall be undertaken only when the expected benefits outweigh the costs of performing the study.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.