41 CFR 109-1.5304
§ 109-1.5304 Deviations.
United States · 41 CFR — Public Contracts and Property Management · Status: effective
Cite this
- Citation
- 41 CFR 109-1.5304, § 109-1.5304 Deviations, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/199213
- Permanent ID
ys:prov:199213@1- SHA-256
7069c396283403dd2ee7207233b7104936b9c27ebd34f46d1244fb6320766704
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Life cycle control determinations. When the PSO approves a contractor program containing controls, other than life cycle control consistent with this subpart, the decision shall be justified in writing and a copy sent to the Office of Management. A PSO's decision not to provide life-cycle control should take into account:
(1) The nature and extent of high risk property typically purchased or otherwise brought to a DOE or designated contractor facility or site;
(2) The projected stability of DOE and designated contractor operations; and
(3) The degree of confidence in the property control measures available at disposition.
(b) Certain transfers, sales, or other offerings of high risk personal property may require special conditions or specific restrictions as determined necessary by the property custodian or cognizant program office.
(c) Requests for deviations from the requirements of this subpart may be made through the cognizant PSO to the Office of Management.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.