42 CFR 427.400
§ 427.400 Definitions.
United States · 42 CFR — Public Health · Status: effective
Cite this
- Citation
- 42 CFR 427.400, § 427.400 Definitions, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/205478
- Permanent ID
ys:prov:205478@1- SHA-256
1ff135917c1058d5a50bd6ecf41d6cdb73b0cb91594ece8f7d6cde32b8f3b3dc
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
As used in this subpart, the following definitions apply:
Currently in shortage means that at least one NDC-10 assigned to the billing and payment code of a Part B rebatable drug with the status “currently in shortage” is on a shortage list maintained by the FDA under section 506E of the FD&C Act.
Drug shortage or shortage means a period of time when the demand or projected demand for the drug within the United States exceeds the supply of the drug (see section 506C(h)(2) of the FD&C Act).
Natural disaster means any natural catastrophe, including, but not limited to any of the following: hurricane, tornado, storm, high water, wind-driven water, tidal wave, tsunami, earthquake, volcanic eruption, landslide, mudslide, snowstorm, or drought, or regardless of cause, any fire, flood, or explosion.
Other unique or unexpected event means any exogenous, unpredictable event outside of a manufacturer's control, including, but not limited to, a geopolitical disruption, pandemic, or act of terror.
Plasma-derived product means a licensed biological product that is derived from human whole blood or plasma, as indicated on the approved product labeling.
Severe supply chain disruption means a change in production or distribution that is reasonably likely to lead to a significant reduction in the U.S. supply of a Part B rebatable biosimilar biological product by a manufacturer and significantly affects the ability of the manufacturer of the biosimilar biological product to fill orders or meet expected demand for its product in the United States for at least 90 days. This definition does not include interruptions in manufacturing due to matters such as routine maintenance, manufacturing quality issues, or insignificant changes made in the manufacturing process for the drug.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.