43 CFR 8.1
§ 8.1 Lands for reservoir construction and operation.
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 8.1, § 8.1 Lands for reservoir construction and operation, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/209276
- Permanent ID
ys:prov:209276@1- SHA-256
206b622b2fd617db0f9a6f0312813bedca7b186692f473952d86bb7ec3bb1e5e
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The fee title will be acquired to the following:
(a) Lands necessary for permanent structures.
(b) Lands below the maximum flowage line of the reservoir including lands below a selected freeboard where necessary to safeguard against the effects of saturation, wave action, and bank erosion and the permit induced surcharge operation.
(c) Lands needed to provide for public access to the maximum flowage line as described in paragraph (b) of this section, or for operation and maintenance of the project.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.