43 CFR 11.35
§ 11.35 How does the authorized official decide whether to use type A or type B procedures?
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 11.35, § 11.35 How does the authorized official decide whether to use type A or type B procedures?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/209339
- Permanent ID
ys:prov:209339@1- SHA-256
8cb6d32079759fa9e14af2851b6703ddcca846dcd2fba832ad7eb2ad0b6e54d2
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) If the authorized official determines under § 11.34 that a type A procedure is available, the authorized official must then decide whether to use that procedure or use type B procedures. The authorized official must make this decision by weighing the difficulty of collecting site-specific data against the suitability of the averaged data and simplifying assumptions in the type A procedure for the release being assessed. The authorized official may use type B procedures if they can be performed at a reasonable cost and if the increase in accuracy provided by those procedures outweighs the increase in assessment costs. Section 1, Volume I of the NRDAM/CME technical document (incorporated by reference, see § 11.18) lists the simplifying assumptions made in the NRDAM/CME. Volumes III through IV of the NRDAM/CME technical document list the data in the NRDAM/CME. Section 1, Volume I of the NRDAM/GLE technical document (incorporated by reference, see § 11.18) lists the simplifying assumptions made in the NRDAM/GLE. Volume III of the NRDAM/GLE technical document lists the data in the NRDAM/GLE.
(b) The authorized official must use type B procedures rather than a type A procedure whenever a potentially responsible party:
(1) Submits a written request for use of type B procedures along with documentation of the reasons supporting the request; and
(2) Advances all reasonable costs of using type B procedures within a time frame acceptable to the authorized official.
(c) If there is no available type A procedure, the authorized official must use type B procedures to calculate all damages.
(d) Except as provided in paragraph (b) of this section, the authorized official may change the type of procedure used in light of comments received on the Assessment Plan. [See § 11.32(e)(2) to determine if the authorized official must provide for additional public review.] However, if the authorized official decides to use type B procedures in lieu of a type A procedure, and cannot confirm exposure under § 11.37, the authorized official may not then use a type A procedure.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.