43 CFR 23.7
§ 23.7 Approval of exploration plan.
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 23.7, § 23.7 Approval of exploration plan, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/209590
- Permanent ID
ys:prov:209590@1- SHA-256
0548769507e17b8f9fcc29cd12c49405063842c0227ee508d04c455491c4ad34
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Before commencing any surface disturbing operations to explore, test, or prospect for minerals covered by the mineral leasing acts the operator shall file with the mining supervisor a plan for the proposed exploration operations. The mining supervisor shall consult with the district manager with respect to the surface protection and reclamation aspects before approving said plan.
(b) Depending upon the size and nature of the operation and the requirements established pursuant to § 23.5 the mining supervisor or the district manager may require that the exploration plan submitted by the operator include any or all of the following:
(1) A description of the area within which exploration is to be conducted;
(2) Two copies of a suitable map or aerial photograph showing topographic, cultural and drainage features;
(3) A statement of proposed exploration methods, i.e. drilling, trenching, etc., and the location of primary support roads and facilities;
(4) A description of measures to be taken to prevent or control fire, soil erosion, pollution of surface and ground water, damage to fish and wildlife or other natural resources, and hazards to public health and safety both during and upon abandonment of exploration activities.
(c) The mining supervisor or the district manager shall promptly review the exploration plan submitted to him by the operator and shall indicate to the operator any changes, additions, or amendments necessary to meet the requirements formulated pursuant to § 23.5, the provisions of the regulations in this part, and the terms of the permit.
(d) The operator shall comply with the provisions of an approved exploration plan. The mining supervisor and the district manager may, with respect to such a plan, exercise the authority provided by paragraphs (f) and (g) of § 23.8 respecting a mining plan.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.