Nev. Rev. Stat. § 278.0195
“Utility project” defined
Nevada · Nevada Revised Statutes Chapter 278 — Planning and Zoning · Status: effective
Cite this
- Citation
- Nev. Rev. Stat. § 278.0195, “Utility project” defined, Nevada, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2098830
- Permanent ID
ys:prov:2098830@1- SHA-256
0bb0598df899a21ff2802019f7ce7c44ce2bb5b7e4e01862b4c5a36cb47e4738
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
“Utility project” means:
1. An electric transmission line which is designed to operate at 200 kilovolts or more; or
2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed,
Ê which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body.