yourstate.us
43 CFR 404.20

§ 404.20 What information must I include in my full proposal to conduct an appraisal or a feasibility study?

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 404.20, § 404.20 What information must I include in my full proposal to conduct an appraisal or a feasibility study?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/210256
Permanent ID
ys:prov:210256@1
SHA-256
74c60cd4895bc123779c3cbe56176ce8b33bd36581d1ee59c8ea0960ad786df3

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

A full proposal to conduct an appraisal investigation or a feasibility study is a detailed scope of work that must include sufficient information to address the eligibility criteria described in §§ 404.6 and 404.7, and the prioritization criteria in § 404.13. In general this may include, but is not limited to: (a) The issues to be addressed in the appraisal investigation or feasibility study and a plan for addressing those issues. The information provided must also address each of the prioritization criteria in § 404.13; (b) A description of who will conduct the appraisal investigation or feasibility study, which could include you, your contractor, or Reclamation; (c) If you propose that either you or your contractor will conduct the appraisal investigation or feasibility study, you must include the information necessary for Reclamation to determine whether you or your contractor are qualified to conduct the investigation or study, and whether having you or your contractor conduct it is a cost-effective alternative, in accordance with the criteria in §§ 404.23 and 404.24; (d) A schedule for conducting the work, identifying specific tasks and the duration of each task, and major milestones with dates for each milestone; (e) A complete budget for conducting the appraisal investigation or feasibility study, including an itemized tabular summary of known or expected costs and a narrative description of those costs; (f) A funding plan that details how the appraisal investigation or feasibility study will be paid for, taking into consideration applicable assistance and non-Federal cost-share requirements; and (g) Any other information requested by Reclamation in the program announcement.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.