§ 404.29 Can the level of effort needed to complete an appraisal investigation or feasibility study be scaled to be proportional to the size and cost of the proposed project?

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 404.29, § 404.29 Can the level of effort needed to complete an appraisal investigation or feasibility study be scaled to be proportional to the size and cost of the proposed project?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/210265
Permanent ID
ys:prov:210265@1
SHA-256
1806a19b00150843e977a52041c3d0f4ca59e7259fd1ca5c9529b1d4b2ce8470

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Yes. In general, the level of effort for an appraisal investigation or feasibility study should be scaled to take into consideration the total size, cost, and complexity of the proposed rural water supply project in order to reduce the total cost of the investigation or study. However, the effort to scale the appraisal investigation or feasibility study must not diminish the quality of the data, the analysis, or the overall completeness of the investigation or study.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.