43 CFR 417.2

§ 417.2 Consultation with contractors.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 417.2, § 417.2 Consultation with contractors, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/210319
Permanent ID
ys:prov:210319@1
SHA-256
a53af86e3c2cbb0c48d1f7aba0060121f26172bb458ae6acadd0711a2c49c8d5

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The Regional Director or his representative will, prior to the beginning of each calendar year, arrange for and conduct such consultations with each Contractor as the Regional Director may deem appropriate as to the making by the Regional Director of annual recommendations relating to water conservation measures and operating practices in the diversion, delivery, distribution and use of Colorado River water, and to the making by the Regional Director of annual determinations of each Contractor's estimated water requirements for the ensuing calendar year to the end that deliveries of Colorado River water to each Contractor will not exceed those reasonably required for beneficial use under the respective Boulder Canyon Project Act contract or other authorization for use of Colorado River water.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.