Nev. Rev. Stat. § 338.0182
Applicability to certain contracts for construction work awarded by public utility on significant operational or capital requirement project
Nevada · Nevada Revised Statutes Chapter 338 — Public Works · Status: effective
Cite this
- Citation
- Nev. Rev. Stat. § 338.0182, Applicability to certain contracts for construction work awarded by public utility on significant operational or capital requirement project, Nevada, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2103952
- Permanent ID
ys:prov:2103952@1- SHA-256
9889209a29aff9b9e473db8384a77ec6011cb8c9452345731fe47a21bcc2de25
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
1. Except as otherwise provided in subsection 2, the provisions of NRS 338.013 to 338.090, inclusive, apply to any contract for construction work awarded by a public utility to a contractor or subcontractor on a significant operational or capital requirement project when the construction work does not qualify as a public work as defined in NRS 338.010.
2. The provisions of subsection 1 do not apply to a contract awarded by an electric utility where the primary construction work will be performed by a contractor with:
(a) A collective bargaining agreement;
(b) A project labor agreement; or
(c) A worksite agreement that provides for the construction of a significant operational or capital requirement project, or for the maintenance of, or other ongoing work to be performed upon completion of, a significant operational or capital requirement project.
3. As used in this section:
(a) “Electric utility” has the meaning ascribed to it in NRS 704.7571.
(b) “Public utility” means a utility that purchases natural gas for retail or an electric utility.
(c) “Significant operational or capital requirement project” means:
(1) The replacement of a natural gas pipeline approved in a plan submitted pursuant to NRS 704.991; or
(2) The construction of a new generation electric utility facility of not less than 50 megawatts and that is approved in a plan submitted pursuant to NRS 704.741.