yourstate.us
43 CFR 2920.9-1

§ 2920.9-1 Construction phase.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 2920.9-1, § 2920.9-1 Construction phase, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/211676
Permanent ID
ys:prov:211676@1
SHA-256
af575d7c70458fe6a8833a2a36304efbca776b40a46add613363db40ec25dd68

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the land use authorization by the selected applicant. (b) Where an authorization to use public lands provides that no construction shall occur until specific permission to begin construction is granted, no construction shall occur until an appropriate Notice to Proceed has been issued by the authorized officer, following the submission and approval of required plans or documents. (c) The authorized officer shall inspect and monitor construction as necessary, to assure compliance with approved plans and protection of the resources, the environment and the public health, safety and welfare. (d) The holder of a land use authorization may be required to designate a field representative who can accept and act on guidance and instructions from the authorized officer. (e) The holder of a land use authorization may be required to provide proof of construction to the approved plan and required standards. Thereafter, operation of the authorized facilities may begin.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.