§ 3171.14 Valid Period of Approved APD.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 3171.14, § 3171.14 Valid Period of Approved APD, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212177
Permanent ID
ys:prov:212177@1
SHA-256
8f820e0336c5b99f9e8a60fa8d19ceadba7aafbe9ca87359dab5d7ed4c7bf62d

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) For APDs approved on or after July 4, 2025, an APD approval is valid for a single 4-year period from the date that it is approved, or until lease expiration, whichever occurs first. (b) Notwithstanding paragraph (a) of this section, if an APD approval expires by reason other than lease expiration, the APD approval shall remain valid if the operator or lessee: (1) Has drilled the well to the approximate total measured depth in the approved APD, including wells drilled to the approximate total measured depth and not yet completed; (2) Is drilling the well with a rig capable of drilling the well to the proposed total measured depth in the approved APD; or (3) Has set the surface casing for the well and has submitted a plan, approved by the BLM prior to expiration of the APD approval, for continuously drilling the well to reach the proposed total measured depth in the approved APD. The plan must include the timeframe for continuously drilling and completing the well and any extenuating circumstances that may delay the continuous drilling and completion of the well. (c) If, upon expiration of the approved APD, the operator created surface disturbance or began drilling the well under the approved APD, the operator or lessee must either comply with all applicable plugging, abandonment, and reclamation requirements or submit a new APD covering the existing disturbance. (d) The operator is responsible for reclaiming any surface disturbance that resulted from its actions, even if a well was not drilled. Earthwork for reclamation must be completed within 6 months of APD expiration (weather permitting). (e) The valid period for an approved APD on a lease suspended under subpart 3103 will be adjusted to account for the suspension. Beginning on the date the suspension is lifted, the valid period of the approved APD will be extended by the time that was remaining on the term of the approved APD on the effective date of the suspension.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.