yourstate.us
43 CFR 3174.4

§ 3174.4 Specific measurement performance requirements.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 3174.4, § 3174.4 Specific measurement performance requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212241
Permanent ID
ys:prov:212241@1
SHA-256
d1ea01f71df270dc7db5c4f855b6d8cb2674c73ee9cabe35d1b884ce97b9944a

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Volume measurement uncertainty levels. (1) The FMP must achieve the following overall uncertainty levels as calculated in accordance with statistical concepts described in API 13.1, the methodologies in API 13.3, and the quadrature sum (square root of the sum of the squares) method described in API 14.3.1, Subsection 12.3 (all incorporated by reference, see § 3174.3) or other methods approved under paragraph (d): Table 1 to § 3174.4—Volume Measurement Uncertainty Levels (2) Only a BLM State Director may grant an exception to the uncertainty levels prescribed in paragraph (a)(1) of this section, and only upon: (i) A showing that meeting the required uncertainly level would involve extraordinary cost or unacceptable adverse environmental effects; and (ii) Written concurrence of the PMT, prepared in coordination with the Deputy Director. (b) Bias. The measuring equipment used for volume determinations must achieve measurement without statistically significant bias. (c) Verifiability. All FMP equipment must be susceptible to independent verification by the BLM of the accuracy and validity of all inputs, factors, and equations that are used to determine quantity or quality. Verifiability includes the ability to independently recalculate volume and quality based on source records. (d) Alternative equipment. The PMT will make a determination under § 3174.13 of this subpart regarding whether proposed alternative equipment or measurement procedures meet or exceed the objectives and intent of this section.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.