yourstate.us
43 CFR 3175.60

§ 3175.60 Timeframes for compliance.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 3175.60, § 3175.60 Timeframes for compliance, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212268
Permanent ID
ys:prov:212268@1
SHA-256
0468fdc00039e625a6cd3d72825c656cda64b3f7cb09af42ef5ed070c8e1d4eb

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) New FMPs. (1) Except as allowed in paragraphs (a)(2) through (4) of this section, the measuring procedures and equipment installed at any FMP on or after January 17, 2017 must comply with all of the requirements of this subpart upon installation. (2) The gas analysis reporting requirements of § 3175.120(e) and (f) will begin on January 17, 2019. (3) High- and very-high-volume FMPs must comply with the sampling frequency requirements of § 3175.115(b) starting on January 17, 2019. Between January 17, 2017 and January 17, 2019, the initial sampling frequencies required at high- and very-high-volume FMPs are those listed in Table 1 to § 3175.110. (4) Equipment approvals required in §§ 3175.43, 3175.44, and 3175.46 through 3175.49 will be required after January 17, 2019. (b) Existing FMPs. (1) Except as allowed in § 3175.61, measuring procedures and equipment at any FMP in place before January 17, 2017 must comply with the requirements of this subpart within the timeframes specified in this paragraph (b). (2) High- and very-high-volume FMPs must comply with: (i) All of the requirements of this subpart except as specified in paragraphs (b)(2)(ii) and (iii) of this section by January 17, 2018; (ii) The gas analysis reporting requirements of § 3175.120(e) and (f) starting on January 17, 2019; and (iii) Equipment approvals required in §§ 3175.43, 3175.44, and 3175.46 through 3175.49 starting on January 17, 2019. (3) Low-volume FMPs must comply with all of the requirements of this subpart by January 17, 2019. (4) Very-low-volume FMPs must comply with all of the requirements of this subpart by January 17, 2020. (c) During the phase-in timeframes in paragraph (b) of this section, measuring procedures and equipment in place before January 17, 2017 must comply with the requirements in place prior to the issuance of this rule, including Onshore Oil and Gas Order No. 5, Measurement of Gas, and applicable NTLs, COAs, and written orders. (d) Onshore Oil and Gas Order No. 5, Measurement of Gas, statewide NTLs, variance approvals, and written orders that establish requirements or standards related to gas measurement and that are in effect on January 17, 2017 are rescinded as of: (1) January 17, 2018 for high-volume and very-high-volume FMPs; (2) January 17, 2019 for low-volume FMPs; and (3) January 17, 2020 for very-low-volume FMPs.