43 CFR 3175.113
§ 3175.113 Spot samples—general requirements.
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 3175.113, § 3175.113 Spot samples—general requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212285
- Permanent ID
ys:prov:212285@1- SHA-256
6e2e103721566af5ac89a5d195e4b1569ca51a8b09e0d09cc4dd76737c4230fd
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) If an FMP is not flowing at the time that a sample is due, a sample must be taken within 15 days after flow is re-initiated. Documentation of the non-flowing status of the FMP must be entered into GARVS as required under § 3175.120(f).
(b) The operator must notify the AO at least 72 hours before obtaining a spot sample as required by this subpart, or submit a monthly or quarterly schedule of spot samples to the AO in advance of taking samples.
(c) Sample cylinder requirements. Sample cylinders must:
(1) Comply with API 14.1, Subsection 9.1 (incorporated by reference, see § 3175.30);
(2) Have a minimum capacity of 300 cubic centimeters; and
(3) Be cleaned before sampling under GPA 2166-05, Appendix A (incorporated by reference, see § 3175.30), or an equivalent method. The operator must maintain documentation of cleaning (see § 3170.7), have the documentation available on site during sampling, and provide it to the BLM upon request.
(d) Spot sampling using portable gas chromatographs.
(1) Sampling separators, if used, must:
(i) Be constructed of stainless steel;
(ii) Be cleaned under GPA 2166-05, Appendix A (incorporated by reference, see § 3175.30), or an equivalent method, prior to sampling. The operator must maintain documentation of cleaning (see § 3170.7), have the documentation available on site during sampling, and provide it to the BLM upon request; and
(iii) Be operated under GPA 2166-05, Appendix B.3 (incorporated by reference, see § 3175.30).
(2) The sample port and inlet to the sample line must be purged using the gas being sampled before completing the connection between them.
(3) The portable GC must be operated, verified, and calibrated under § 3175.118.
(4) The documentation of verification or calibration required in § 3175.118(d) must be available for inspection by the BLM at the time of sampling.
(5) Minimum number of samples and analyses.
(i) For low- and very-low-volume FMPs, at least three samples must be taken and analyzed;
(ii) For high-volume FMPs, samples must be taken and analyzed until the difference between the maximum heating value and minimum heating value calculated from three consecutive analyses is less than or equal to 16 Btu/scf;
(iii) For very-high-volume FMPs, samples must be taken and analyzed until the difference between the maximum heating value and minimum heating value calculated from three consecutive analyses is less than or equal to 8 Btu/scf.
(6) The heating value and relative density used for OGOR reporting must be:
(i) The mean heating value and relative density calculated from the three analyses required in paragraph (d)(5) of this section;
(ii) The median heating value and relative density calculated from the three analyses required in paragraph (d)(5) of this section; or
(iii) Any other method approved by the BLM.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.