43 CFR 3276.13
§ 3276.13 What additional information must I give BLM in the monthly report for flash and dry steam facilities?
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 3276.13, § 3276.13 What additional information must I give BLM in the monthly report for flash and dry steam facilities?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212741
- Permanent ID
ys:prov:212741@1- SHA-256
020dcf3ec7b617aabbe13bdcca6791e7bc3d7542bf7438fc2e25a5cc968c24cd
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
In addition to the regular monthly report information required by § 3276.12, send to BLM:
(a) Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;
(b) Condenser pressure in psia;
(c) Condenser temperature in deg. F;
(d) Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;
(e) Flow of condensate out of the plant (after the cooling towers) in klbs; and
(f) Any other information we may require.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.