§ 3281.15 What is the minimum initial unit obligation a unit agreement must contain?
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 3281.15, § 3281.15 What is the minimum initial unit obligation a unit agreement must contain?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/212779
- Permanent ID
ys:prov:212779@1- SHA-256
12be98cfbc50a3efebad547b1db0f79f7fd38f30b7bfaf33be8679b1df4ed81d
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The unit agreement must:
(1) Require the unit operator to drill, within the timeframe specified in the unit agreement, at least one unit well on a tract committed to the unit agreement;
(2) Specify the location and the minimum depth and/or geologic structure to which the initial unit well will be drilled; and
(3) Require the unit operator, upon completing a unit well, to provide to BLM in a timely manner the information required at § 3264.10 of this chapter.
(b) Depending on the size of the proposed unit area, BLM may require the minimum initial unit agreement obligation to include the drilling of more than one unit well.
(c) If necessary to aid in the evaluation of drilling locations, BLM and the unit operator may agree to include types of exploration operations as part of the initial unit obligation. An example of such work is drilling temperature gradient wells.
(d) BLM will not consider any work done prior to unit approval for the purpose of meeting initial unit obligations.