yourstate.us
Nev. Rev. Stat. § 534.039

Perennial yield of basin designated as critical management area: Duty of State Engineer to affirm, modify and review

Nevada · Nevada Revised Statutes Chapter 534 — Underground Water and Wells · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Nev. Rev. Stat. § 534.039, Perennial yield of basin designated as critical management area: Duty of State Engineer to affirm, modify and review, Nevada, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2128200
Permanent ID
ys:prov:2128200@1
SHA-256
76b6a694f28c299911d40999b4d38c6f7fce045694758444ad2f1dce771837a0

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

1. If the State Engineer designates a basin as a critical management area pursuant to subsection 7 of NRS 534.110, the State Engineer shall, in the order designating the critical management area, affirm or modify the perennial yield of the designated basin. 2. The State Engineer may, by order, modify the perennial yield of a basin set forth in the order designating the critical management area pursuant to subsection 1 if the State Engineer determines, after consideration of the best available science, that the perennial yield of the basin is different from the perennial yield set forth in such order. 3. The State Engineer shall, before reviewing the results of a groundwater management plan pursuant to subsection 8 of NRS 534.037, review the perennial yield of the basin set forth in the order pursuant to subsection 1 and may modify the perennial yield of the basin pursuant to subsection 2 if the State Engineer determines the perennial yield has changed.