Nev. Rev. Stat. § 624.890
Contractor who commits certain violations may be required to obtain services of construction control
Nevada · Nevada Revised Statutes Chapter 624 — Contractors · Status: effective
Cite this
- Citation
- Nev. Rev. Stat. § 624.890, Contractor who commits certain violations may be required to obtain services of construction control, Nevada, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2136998
- Permanent ID
ys:prov:2136998@1- SHA-256
9bd1fdbcba7d46efe615d3b13384f3b43e8f6d7e1cd781fc6125541631837554
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
1. If a contractor who performs work concerning a residential photovoltaic system used to produce electricity is determined by the Board to have violated:
(a) One or more of the provisions of NRS 624.301 to 624.305, inclusive, 624.860, 624.870 or 624.875; or
(b) Any regulation adopted by the Board with respect to contracts for work concerning a residential photovoltaic system used to produce electricity,
Ê the Board may require that the contractor obtain the services of a construction control for each contract that the contractor enters into for work concerning a residential photovoltaic system used to produce electricity.
2. The contractor may not:
(a) Be related to the construction control or to an employee or agent of the construction control; or
(b) Hold, directly or indirectly, a financial interest in the business of the construction control.
3. As used in this section, “construction control” has the meaning ascribed to it in NRS 627.050.