43 CFR 3861.1-1
§ 3861.1-1 Application for survey.
United States · 43 CFR — Public Lands: Interior · Status: effective
Cite this
- Citation
- 43 CFR 3861.1-1, § 3861.1-1 Application for survey, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/214008
- Permanent ID
ys:prov:214008@1- SHA-256
fd5947ebd69745144de3b27819b6da51567342b913fc27fbc5e46a1071cb96f9
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The claimant is required, in the first place, to have a correct survey of his claim made under authority of the proper cadastral engineer, such survey to show with accuracy the exterior surface boundaries of the claim, which boundaries are required to be distinctly marked by monuments on the ground. He is required to have a correct survey where patent is applied for and where the mining claim is in vein or lode formation, or covers lands not surveyed in accordance with the U.S. system of rectangular surveys, or where the mining claim fails to conform with the legal subdivisions of the federal surveys. Application for authorization of survey should be made to the appropriate land office (see § 1821.2-1 of this chapter).