yourstate.us
43 CFR 3930.11

§ 3930.11 Performance standards for exploration and in situ operations.

United States · 43 CFR — Public Lands: Interior · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 CFR 3930.11, § 3930.11 Performance standards for exploration and in situ operations, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/214182
Permanent ID
ys:prov:214182@1
SHA-256
9340f79e78472af81abff2da5c1d23c60b1e91e6fba226890f4be02bfe1cd6e6

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The operator/lessee must adhere to the following standards for all exploration and in situ drilling operations: (a) At the end of exploration operations, all drill holes must be capped with at least 5 feet of cement and plugged with a permanent plugging material that is unaffected by water and hydrocarbon gases and will prevent the migration of gases and water in the drill hole under normal hole pressures. For holes drilled deeper than stripping limits, the operator/lessee, using cement or other suitable plugging material the BLM approves in advance, must plug the hole through the thickness of the oil shale bed(s) or mineral deposit(s) and through aquifers for a distance of at least 50 feet above and below the oil shale bed(s) or mineral deposit(s) and aquifers, or to the bottom of the drill hole. The BLM may approve a lesser cap or plug. Capping and plugging must be managed to prevent water pollution and the mixing of ground and surface waters and to ensure the safety of people, livestock, and wildlife; (b) The operator/lessee must retain for 1 year all drill and geophysical logs. The operator must also make such logs available for inspection or analysis by the BLM. The BLM may require the operator/lessee to retain representative samples of drill cores for 1 year; (c) The operator/lessee may, after the BLM's written approval, use drill holes as surveillance wells for the purpose of monitoring the effects of subsequent operations on the quantity, quality, or pressure of ground water or mine gases; and (d) The operator/lessee may, after written approval from the BLM and the surface owner, convert drill holes to water wells. When granting such approvals, the BLM will include a transfer to the surface owner of responsibility for any liability, including eventual plugging, reclamation, and abandonment.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.