Conn. Gen. Stat. § 19a-37d
Changes to public water supply systems. Required notifications to water company and local building inspector. Authority of local director of public health to implement mitigation measures
Connecticut · General Statutes of Connecticut Chapter 368a — Department of Public Health · Status: effective
Cite this
- Citation
- Conn. Gen. Stat. § 19a-37d, Changes to public water supply systems. Required notifications to water company and local building inspector. Authority of local director of public health to implement mitigation measures, Connecticut, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2184765
- Permanent ID
ys:prov:2184765@1- SHA-256
0b20e9edb4c8abeb6d64bea723e8a890e16d172180f59c3b74f58625962312f4
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Any person engaged in the installation of an irrigation system or other physical connection between the distribution system of a public water supply system and any other water system shall notify the water company servicing the property or building of such installation and shall be subject to all applicable rules and regulations of such water company. For purposes of this section, “water company” has the same meaning as provided in section 25-32a.
(b) When a permit application is filed with the local building inspector of any municipality concerning any project that includes a change of use or installation of fixtures or facilities in a building that may affect the performance of, or require the installation of, a reduced pressure principle backflow preventer, a double check valve assembly or a pressure vacuum breaker, the local building inspector shall provide written notice of the application to the water company serving the building not later than seven days after the date the application is filed. Upon receipt of such written notice, the water company shall cause to be performed an evaluation of cross-connection protection by a person who has met the requirements prescribed in the regulations of Connecticut state agencies and such water company shall notify the local building inspector regarding its determination. The local building inspector shall not issue a permit or certificate of occupancy until any cross-connection issue has been corrected.
(c) Upon a determination by a local director of health that an automatic fire extinguishing system, irrigation system, change of use, installation of fixtures or facilities in a building or other physical connection between the distribution system of a public water supply system and any other water system creates an unreasonable risk of injury to the health or safety of persons using the water, to the general public, or to any public water supply, the local director of public health may issue an order requiring the immediate implementation of mitigation measures, that include, but are not limited to, the disconnection of the system. In the event that a cross connection with the public water system is found, the owner of such system may terminate services to the premises.