46 CFR 2.95-10
§ 2.95-10 Equipment or material required to be approved.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 2.95-10, § 2.95-10 Equipment or material required to be approved, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/223132
- Permanent ID
ys:prov:223132@1- SHA-256
ab6a79dc4708c2da44a7be97fdc9dcf6b2f2f5d2ddbe03c447edd4b9adff11be
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The manufacturer of any equipment or material, which must also be approved by or found satisfactory for use by the Commandant, shall keep the required drawings, plans, blueprints, specifications, production models (if any), qualification tests, and related correspondence containing evidence that the Coast Guard has found such equipment or material satisfactory, during the period of time the approval or listing is valid. Most of the specifications containing detailed descriptions of records required to be retained by the public are in parts 160 to 164, inclusive in subchapter Q (Specifications) of this chapter.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.