§ 39.6005 Inspection prior to conducting gas-freeing operations—B/ALL.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 39.6005, § 39.6005 Inspection prior to conducting gas-freeing operations—B/ALL, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/224583
Permanent ID
ys:prov:224583@1
SHA-256
77841f680441e7665c19108fa500158a6029ee28747ab073f32919fb70296fdf

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The following inspections must be conducted by the barge person in charge prior to commencing gas-freeing operations, and show that— (1) Each part of the barge's vapor collection system is aligned to allow vapor to flow to a cleaning facility's vapor control system (VCS); (2) If a fluid displacement system is used to conduct gas-freeing operations— (i) The fluid supply line is connected to the fluid injection connection; and (ii) The maximum fluid injection rate is determined in accordance with 46 CFR 39.6007(c)(2); (3) The maximum stripping or gas-freeing rate is determined in accordance with 46 CFR 39.6003(c) or 39.6007(c), respectively, and adequate openings required by 46 CFR 39.6007(c)(1) are available and identified; (4) The pressure-sensing and pressure-indicating devices required by 33 CFR 154.2203 are connected as required by 46 CFR 39.6003(b); (5) The maximum and minimum operating pressures of the barge being cleaned are determined; (6) Unrepaired loose covers, kinks, bulges, gouges, cuts, slashes, soft spots, or any other defects which would permit the discharge of vapors through the vapor recovery hose material must be detected during inspection and repaired prior to operation; (7) The facility vapor connection is electrically insulated from the barge vapor connection and the fluid injection connection is electrically insulated from the fluid injection source, if fitted, in accordance with OCIMF ISGOTT section 17.5 (incorporated by reference, see 46 CFR 39.1005); and (8) All equipment is bonded in accordance with 46 CFR 39.6001(h).

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.