yourstate.us
46 CFR 42.13-25

§ 42.13-25 Load line mark.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 42.13-25, § 42.13-25 Load line mark, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/224658
Permanent ID
ys:prov:224658@1
SHA-256
69e4cda25b9a58ff97d6c3a5642623e00e157976d5a77082b5aaef0c219ea74c

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The load line mark shall consist of a ring 12 inches in outside diameter and 1 inch wide which is intersected by a horizontal line 18 inches in length and 1 inch in breadth, the upper edge of which passes through the center of the ring. The center of the ring shall be placed amidships and at a distance equal to the assigned summer freeboard measured vertically below the upper edge of the deck line (as illustrated in Figure 42.13-25(a)).

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.