§ 52.01-135 Inspection and tests (modifies PG-90 through PG-100).

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 52.01-135, § 52.01-135 Inspection and tests (modifies PG-90 through PG-100), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/224935
Permanent ID
ys:prov:224935@1
SHA-256
d4d540d2f36d667af0b66494470bbf1a8241444365b8b18bed59bf5734011264

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Requirements. Inspection and test of boilers and boiler pressure parts must be as indicated in PG-90 through PG-100 of Section I of the ASME BPVC (incorporated by reference; see § 52.01-1) except as noted otherwise in this section. (b) Inspection personnel. The inspections required by PG-90 through PG-100 of Section I of the ASME BPVC must be performed by the “Authorized Inspector” as defined in PG-91 of Section I of the ASME BPVC. The Authorized Inspector must hold a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors. After installation, boilers will be inspected for compliance with this part by the “Marine Inspector” as defined in § 50.10-15 of this subchapter. (c) Hydrostatic test. (Modifies PG-99.) Each new boiler must be hydrostatically tested after installation to 1.5 times the maximum allowable working pressure as indicated in PG-99 of Section I of the ASME BPVC. Before the boilers are insulated, accessible parts of the boiler must be emptied, opened, and all interior surfaces must be examined by the marine inspector to ascertain that no defects have occurred due to the hydrostatic test. (d) Operating tests. In addition to hydrostatic tests prescribed in paragraph (c) of this section, automatically controlled propulsion and auxiliary boilers must be subjected to operating tests as specified in §§ 61.30-20, 61.35-1, 61.35-3, 62.30-10, 63.15-9, 63.25-3, and 63.25-5 of this subchapter, as appropriate, or as directed by the Officer in Charge, Marine Inspection, for propulsion boilers. These tests are to be performed after final installation.