yourstate.us
46 CFR 54.25-7

§ 54.25-7 Requirement for postweld heat treatment (modifies UCS-56).

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 54.25-7, § 54.25-7 Requirement for postweld heat treatment (modifies UCS-56), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225032
Permanent ID
ys:prov:225032@1
SHA-256
bee2d05e5b0f2d9ddd4e379c02667ff38e46af0daaa7fabfc236a5874e3e5089

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Postweld heat treatment is required for all carbon and low alloy steel Class I, I-L, and II-L vessels regardless of thickness. (Refer to table 2 to § 54.01-5 for applicable requirements.) (b) Cargo tanks which are fabricated of carbon or low alloy steel as Class II pressure vessels, designed for pressures exceeding 100 pounds per square inch gage and used in the storage or transportation of liquefied compressed gases must be postweld heat treated regardless of thickness.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.