§ 56.97-25 Preparation for testing (modifies 137.2).
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 56.97-25, § 56.97-25 Preparation for testing (modifies 137.2), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225164
- Permanent ID
ys:prov:225164@1- SHA-256
50b082e8a9c8e86f450e491e8b5fe83949d12e50a03eb652fe0116a0e830f7e2
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Exposure of joints. All joints including welds must be left uninsulated and exposed for examination during the test.
(b) Addition of temporary supports. Piping systems designed for vapor or gas may be provided with additional temporary supports, if necessary.
(c) Restraint or isolation of expansion joints. Expansion joints must be provided with temporary restraint, if required for the additional pressure load under test.
(d) Isolation of equipment not subjected to pressure test. Equipment that is not to be subjected to the pressure test must be isolated by a blank flange or equivalent means.
(e) Treatment of flanged joints containing blinds. Flanged joints at which blinds are inserted to blank off other equipment during the test need not be tested.
(f) Precautions against test medium expansion. If a pressure test is to be maintained for a period of time and the test medium in the system is subject to thermal expansion, precautions must be taken to avoid excessive pressure. A small relief valve set to 1 1/3 times the test pressure is recommended during the pressure test.