46 CFR 59.15-10
§ 59.15-10 Bagged or blistered shell plates.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 59.15-10, § 59.15-10 Bagged or blistered shell plates, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225299
- Permanent ID
ys:prov:225299@1- SHA-256
9724cbe6343d5843cf722b60e9f8a25ad6c11310cc7a33eb000860bad91acced
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) When the shell plates of cylindrical boilers which are exposed to the radiant heat of the fire become bagged or blistered, it is the duty of the chief engineer to notify the Officer in Charge, Marine Inspection, for examination before raising steam on the boiler.
(b) Where the shell plate is bagged due to overheating, the Officer in Charge, Marine Inspection, may, if in their judgment it is practicable, permit the same to be driven back to its original position.
(c) Where the shell plate has blistered, bagged, or bulged to such an extent that there is an appreciable thinning of the plate, the Officer in Charge, Marine Inspection, must require the defective portion to be cut away and the shell repaired by fitting a patch of steel plate conforming to the requirements of § 52.01-90 of this subchapter in place of the defective portion. Care must be taken that the riveting schedule of the patch is so arranged as to give the plate sufficient strength to withstand the stress placed on it in service.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.