46 CFR 61.05-5

§ 61.05-5 Preparation of boilers for inspection and test.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 61.05-5, § 61.05-5 Preparation of boilers for inspection and test, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225310
Permanent ID
ys:prov:225310@1
SHA-256
def0b09535c3ffeb0cc67d4416848900931d80afc86d98a86b35d99fedf760cf

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) For internal inspection, manhole and handhold plates, and washout plugs must be removed as required by the marine inspector and the furnace and combustion chambers must be thoroughly cooled and cleaned. (b) In preparing the boilers for the hydrostatic test, they must be filled with water at not less than 70 °F and not more than 160 °F for watertube boilers, and not more than 100 °F for firetube boilers. The safety valves must be secured by means of gags or clamps.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.